Firewall Forward

11-30-05 Photos of Engine on cart ready for assembly at Aerosport Power.

1-4-06 Engine arrives! Out of the crate photos.

1-6-06 Mounted EI fuel flow transducer.


2-16-06 20 Hours. Moved the Fuselage to Cable Airport, Mounted the engine, installed the exhaust system and mounted the carb and fuel lines.

2-27-06 8.0 Hours Mounted Carb linkage. Mounted oil pressure sensor. Mounted MP line.
mounted Fuel pump overflow drain. Installed Mag wiring harness.

5-13-06 Photos

6-1-06 Photos

6-16-06 Photos

7-2-06 Photos

8-16-06 Photos

11-13-06 Photos

11/06 thru 2-11-06 Baffels and engine plumbing.

3-12-07 Cowl work.

4-7-09 Cowl work and installed and torqued the prop extension from Saber Mfg. and bled the brakes.