04-21-03 2.0
Hours
Well the wings, or should I say wing parts finally arrived!!!
By Fed X Freight. As we unloaded the boxes from the truck the driver noticed
the end of the spar box was punched through. We pulled the end of the box
off and inspected. Everything seemed ok but I still had him call in and report
the box damage and record it on the shipping invoice.
I opened the spar box and thank God there was no damage.
Once I had the boxes open I found places to store the parts. There is
definitely a lot of parts. (Wing arrival photos)
04-26-03 2.5
Hours
Took Inventory and organized all components. Bins
work very well for this.
Worked on wing jig. I will be doing both wings at the same
time.
04-27-03 1.0
Hour
Countersunk nutplate attach holes in 1st. spar.
04-27-03 1.0
Hour
Riveted nutplates on 1st spar.
05-5-03 0.5
Hour
Countersunk nutplate attach holes in 2nd. spar.
05-11-03 3.0
Hours
Fabricated tie
down brackets, deburred, cleaned and alodined.
05-13-03 3.5
Hours
Sized
Bell crank bushings and Bell cranks. Honed for good, free fit of bushing.
Installed W-933 tie down bracket and the WD421-R Bell crank. Leave the bushing
.015/.030 longer than the bell crank. This will
allow the bell crank to move on the bushing and gives .015/.030 of vertical
play. Also, it took a few good looks at drawing #9 to figure that the WD421-R
(right) Bell crank goes on the left spar. Go figure?
05-17-03 4.0
Hours
Installed
left bell crank assembly. Deburred rear spars and doublers.
05-19-03 2.0
Hours
Drilled
and deburred left rear spar and W907E and D. Enlarged
aileron push rod tube holes.
05-21-03 2.0
Hours
Drilled
and deburred right rear spar and W907E and D. Enlarged aileron push rod tube
holes.
05-23-03 2.0
Hours
Matched
drilled rear spar and 907C & B doublers and deburred. Drilled #40 holes
in top of rear spars in area where 907C & B go and dimpled. Due to lack
of room after the 907C & B are riveted into place.
Due to the time it takes to maintain this site
I will be doing things just a little different. Instead of links to photos
embedded in the text I will create a photos section page that will contain
thumb nails to the larger photos to save some time. I will also include
text in the larger photos when I feel it is needed or I have the time
to do it.
06-09-03 4.0
Hours
Inventoried
Fuselage and Finishing kit.
06-12-03 1.5
Hours
Matched
drilled Ribs and Spars left wing.
06-13-03 2.0
Hours
Deburred
Ribs left wing.
06-14-03 4.0
Hours
Deburred
Ribs left and right wing.
06-17-03 3.0
Hours
Deburred
lightening holes.
06-18-03 2.0
Hours
Deburred Ribs some more.
06-20-03 1.5
Hours
Deburred
Flap and Aileron Brackets.
06-22-03 6.0
Hours
Deburred
Flap and aileron brackets. Fabricated A914 stops. Clecoed and matched drilled
Aileron brackets. Matched drilled Aileron brackets to rear spar.( Did this
prior to prime and Assy. of rear spar.) Fabricated the W925B and C's. Matched
drilled W925 brackets and the W911 and W910. Matched drilled the 925 Assy
to the outboardW911 and W910 inboard ribs and rear spar. ( Leaving center
flap bracket until later when skins on on.
06-23-03 2.0
Hours
Matched drilled flap gap faring to rear spar left wing and Aileron gap faring.
06-24-03 2.0
Hours
Fabricated and matched drilled flap brackets, right wing. ( Only fabed brackets
for center flap bracket rib #7. It will be drilled in place later.
06-26-03 4.5
Hours
Finished
drilling right wing flap brackets. Matched drilled flap and aileron gap
fairing. Deburred brackets. Countersunk #40 on the rear spars where the
doubler plates are underneath. Dimpled the 3 holes on the outboard end
of the rear spar for outboard rib. Deburred rear spars. Deburred ribs
and red wheeled to remove scratches. Also, used scotchbrite Loc wheels
and a die grinder to deburr with. Worked Great!
07-5-03
1.0 Hours
Drilled
.750 hole in ribs for electrical.
07-6-03 1.5
Hours
Metal
preped, washed and Alodined ribs.
07-7-03 2.0
Hours
Primed
ribs.
07-8-03 to 07-10-03 4.0
Hours
Assembled
rear spar and ribs with aileron brackets and flap outboard& inboard
brackets. Left out mid bracket for now.
07-12-03 3.0
Hours
Riveted
left ribs and rear spar to main spar.
08-02-03 2.0
Hours
Riveted
ribs to right main spar.
08-05-03 1.5
Hours
Finished
match drilling bottom left skins and removed skin.
08-09-03 5.0
Hours
Matched
drilled left leading edge. Put ribs in L. fuel tank. Finished splice strip.
08-21-03 1.0
Hours
Fab
left and right tank stiffners& drilled. Made W932-DG
08-23-03 2.0
Hours
Made
the T912 brackets. Drilled 1/8 & 3/16 holes, clecoed and blind riveted
the 912's to the tank and mounted the tank to the wing.
08-24-03 2.5
Hours
Drilled
3/16 holes through the spar into the 912's. Drilled splice and checked
twist. Less than .020. Removed brackets to deburr.
08-27-03 1.0
Hours
Started
countersinking left tank 901-902 span of rivet holes.
08-30-03 3.0
Hours
Finished
countersinking 901-902 holes in the left tank. Drilled #19 holes in 901
splice strip.
09-03-03 1.0
Hours
Worked
on fabricating the T905 and starting drilling the T912 for nutplates.
09-05-03 1.5
Hours
Finished
fabricating T905L.
09-07-03 4.0
Hours
Drilled
T905 and reinforcement T410's. Flycut tank ends and drilled mounting flanges.
Drilled and dimpled T903 end ribs. Attached nutplates to T407 ring.
09-11-03 1.0
Hours
Removed
all clecos from left wing and removed skins.
09-19-03 1.5
Hours
Clecoed
ribs to right leading edge. Clecoed to R spar. Started putting ribs in
R tank.
10-06-03 2.0
Hours
Drilled
L leading edge ribs to main spar. Had forgot to do this. Matched drilled
R top skins to ribs and spars.
10-11-03 1.2
Hours
Matched
drilled skins. Matched drilled w919 strip to L.E.
10-20-03 2.5
Hours
Finished
match drilling R Tank. Drilled tank brackets to the T902 Baffle. Matched
drilled tank and T912 to R main spar.
11-30-03 4.0
Hours
Finished
fabricating T905R and drilled to IB rib. Drilled T410's. Drilled T407
ring and countersunk. Dimpled T903 end rib and riveted nutplates.
12-01-03 1.0
Hours
Countersunk spar to skin rivet holes.
12-14-03 8.0
Hours
Deburring and dimpling wing skins.
12-15-03 1.5
Hours
Deburring and dimpling wing skins.
12-16-03 2.0
Hours
Deburring wing skins.
12-19-03 1.5
Hours
Deburred wing skins and tank ribs.
12-20-03 6.0
Hours
Deburred and dimpled skins and ribs.
12-21-03 6.0
Hours
Deburred and dimpled LE skins, bottom wing
skins and countersunk L main spar.
12-24-03 to 12-31-04 15.0
Hours
Dimpled splice strips. Riveted on nutplates.
Washed, alodined and primed LE components and skins. Riveted L LE together
and clecoed to Main spar.
01-03-04 5.0
Hours
Riveted L LE to main spar. Finished L LE.
Riveted R LE together and clecoed to R main spar.
01-04-04 to 1-16-04 4.0
Hours
Deburred and dimpled tank skins.
01-13-04 2.0
Hours
Drilled R. Finished match drilling R Tank.
Drilled tank brackets to the T902 Baffle. Matched drilled tank and T912
to R main spar. Finished fabricating T905R and drilled to IB rib. Drilled
T410's. Drilled T407 ring and countersunk. Dimpled T903 end rib and riveted
nutplates. Finished match drilling R Tank. Drilled tank brackets to the
T902 Baffle. Matched drilled tank and T912 to R main spar. Finished match
drilling R Tank. Drilled tank brackets to the T902 Baffle. Matched drilled
tank and T912 to R main spar. Finished match drilling R Tank. Drilled
tank brackets to the T902 Baffle. Matched drilled tank and T912 to R main
spar. Finished match drilling R Tank. Drilled tank brackets to the T902
Baffle. Matched drilled tank and T912 to R main spar.
01-17-04 5.0
Hours
Riveted and sealed L tank ribs, all but end
ribs.
01-18-04 3.5
Hours
Riveted and sealed L. tank end ribs, T905
bracket and reinforcement plate.
01-22-04 2.5
Hours
While waiting on tool, started L&R ailerons.
01-26-04 2.0
Hours
Assembled L. tank access plate, Fittings
and vent line.
01-31-04 3.5
Hours
Finished sealing L. tank.
02-01-04 2.0
Hours
Dimpled R. tank skin and cleaned parts.
02-02-04
3.0
Hours
Sealed fuel sender L. tank. Riveted stiffeners
, drain and cap flange R. tank.
02-03-04 1.0
Hours
Pressure tested tank using compressed air
and soapy water. No leads found.
02-05-04 1.0
Hours
Mounted L. tank
02-06-04 1.0
Hours
With Joshua's help, started riveting left
top I.B. skin
02-07-04 2.0
Hours
Made the W918 control rods.
02-08-04
2.0
Hours
Made the w917 control rods.
02-16-04 1.0
Hours
Riveted L. top skin.
02-17-04 2.5
Hours
Riveted L. top skin.
02-22-04 2.0
Hours
Riveted top left skins.
02-25-04 2.5
Hours
Sealed and riveted R. tank.
02-27-04 2.0
Hours
Sealed and riveted R. tank.
02-28-04 2.5
Hours
Sealed and riveted R. tank.
03-06-04 2.5
Hours
Installed vent line and Assembled pickup
tube(Vans). Installed and sealed cover plate.
03-07-04 4.5
Hours
Mounted sender and adjusted. Sealed and closed
tank baffle. Riveted tank mounting brackets. Cleaned a couple hundred
clecos. Note: I think my countersinks were not deep enough on some holes.
Had some high rivets.
03-13-04 5.0
HoursInstalled fuel sender R. tank. Riveted
R. leading edge rib. * Joshua shot the rivets and I bucked. He did a great
job! Squeezed L.E. skin to spar rivets. Leak tested R. tank- no leaks.
Cleaned and primed tank ext. areas. Mounted tank.
03-20-04 4.0
Hours
Finished installing tank screws. Primed R
wing top skins. Clecoed skins to spar and ribs.
03-21-04 2.5
Hours
Match drilled stiffeners to left aileron
skins and started to dimple skins.
03-23-04 2.0
Hours
?????
03-27-04 7.0
Hours
Made flap/aileron table out of MDF and 2x4s.
Shaved high rivets on r-tank. Dimpled L aileron skins. Dimpled stiffeners.
Cleaned parts for prime. Primed skins and stiffeners. Back riveted stiffeners
to skins. Clecoed bottom skin on and matched drilled to 905LR. Deburred
and dimpled skin and 905R&L bottom. Assembled w/ 2 rivets in 905L/R and
flipped the assembly over. Clecoed nose skin to Bottom and flipped back
over. Clecoed nose to top spar and skin. Top skin at this point looked
very wavy! Made sand bags out of cement (dry) and freezer bags and used
a ½ x 3 board to evenly distribute the 4 bags. Total weight was aprox.
45 lbs. Drilled nose ribs and counterbalance tube. Placed AEX wedge in
T.E., drilled and clecoed to table.
03-30-04 1.0
Hours
Deburring aileron parts.
04-02-04 2.0
Hours
Dimpled nose ribs and 905LR. Countersunk
AEX wedge. Dimpled TE of top and bottom skins and spar row.
04-03-04 4.0
Hours
Scotch brite ribs, spar, doubler plates,
etc. Cleaned and primed parts. Riveted frame assembly. Riveted skins on
to spar and ribs. Tank sealant on T.E. and clecoed to flap table to cure.
04-06-04 1.0
Hours
Riveted trailing edge. Assembled hinges and
torqued nuts.
04-09-04 1.5
Hours
Deburred r- aileron parts and skins.
04-10-04 1.0
Hours
Clecoed r-aileron frame and drilled counterbalance
tube.
04-11-04 1.0
Hours
Dimpled skins and stiffeners.
04-17-04 3.0
Hours
Riveted stiffeners onto skins. Started to
match drill bottom skins to 905LR and noticed that the spar and skin holes
didn't line up. I dimpled the wrong side of the bottom skin and now it's
reversed. Drilled out stiffeners to use again. Scrapped skin. Will order
new one. Started left flap. De- plastic parts, straightened 908 spacers
and frap brackets. Clecoed to spar and matched drilled.
04-18-04 1.0
Hours
04-19-04 2.5
Hours
04-20-04 2.5
Hours
04-22-04 1.5
Hours
04-26-04 1.0
Hours
05-09-04 1.0
Hours
05-11-04 3.5
Hours
05-13-04 8.0
Hours
05-15-04 3.0
Hours
05-16-04 1.5
Hours
05-17-04 2.0
Hours
05-25-04 3.5
Hours
05-27-04 3.5
Hours
06-05-04 3.0
Hours
06-08-04 1.5
Hours
06-09-04 1.5
Hours
06-11-04 3.0
Hours
06-12-04 3.5
Hours
06-13-04 1.5
Hours
06-15-04 1.5
Hours
06-16-04 4.0
Hours
06-19-04 1.0
Hours
06-21-04 1.0
Hours
06-23-04 0.5
Hours
06-25-04 1.0
Hours
06-26-04 1.0
Hours
06-28-04 2.0
Hours
07-17-04 2.5
Hours
07-18-04 1.0
Hours
07-20-04 5.5
Hours
Total Hours 308.2 |